After 5 months of operation with Eco Water Industry in the hot water circulation loop, there is a stable heat transfer coefficient during water heating. Cleaning of the dismantled plate heat exchangers, which previously required mandatory cleaning every 3 months to achieve sufficient hot water pressure for reaching the upper floors of the building, has been reduced.
The need on the farm is for the purification of hard water extracted from groundwater for the dilution of urea, fertilizers, and spray solutions. With the purified water using "Eco Water Industry G2", chemicals and urea are better diluted, the nozzles of the sprayers do not get clogged, and the production of cultivated crops is increased under the influence of easily absorbable fertilizers.
The Eco Water INDUSTRY G2 has been installed on the humidification
system and water supply of the farm.
However, despite the water in the
well having a hardness of 24 OdH - the nozzles of the humidification
system have not been changed for 2 years, and there have been no
reported cases of water-related diseases among the animals.
Before the installation of Eco Water INDUSTRY G2, it was necessary for the boiler, sinks, and other water-using devices to be chemically cleaned every 2-3 weeks according to the regulations of the regional health inspector. After the installation, it is only necessary to lightly clean the electric coils once every 6 months. The boiler itself remains clean. Additional benefits include saving on electricity, resources, and labor for chemical cleaning.