Installation of Eco Water between 03.08.2017 and 14.08.2017 at the entrance of the cold water into the plate heat exchanger and in the circulation pipe of hot water in a residential building in the town of Shala. The Eco Water devices were installed in 10 residential blocks, of which 7 were monitored.
After installing Energywater Eco Water G1 HOME, the specific heat energy consumption (kWh) for water heating decreased by more than 20%. Due to the gradual self-cleaning of the plate heat exchanger, the pressure increased, and hot water easily reaches the upper floors.
After 5 months of operation, the result is a 10% fuel oil savings and trouble-free operation of the hospital when using hot water.
Regarding hospital equipment, there are high hygiene requirements for drinking water and the Eco Water device fully meets these requirements.
On the 'Water-to-Water' cooling system at the stadium, 3 MWD Industry G2 PN16 units have been installed. After 3 years of operation, the total savings amount to more than 15,000 euros per year. During the three-year operation, the zinc anodes were replaced 5 times, through which a total of 650,000 m3 of water flowed, or 325 full Olympic swimming pools were purified.